Hot water repipe and secondary circuit in Guidepost

This is a massive old house in Sheepwash, and the customer had no hot water at any of the downstairs taps. The cause was a hot water run leaking under the concrete ground floor, so much that there was barely any pressure coming out of the taps at all. Rather than break up the floor, I cut off the downstairs circuit and repiped the whole ground floor from the floor above.

Job
Hot water repipe, secondary circuit
Time on site
One week
Included
New copper runs, isolation valves, secondary circuit
Outcome
Instant hot water at every tap

The problem

The house had lost hot water to every downstairs tap. Tracing it back, the hot water pipework running under the concrete ground floor was leaking badly, so much water was escaping into the floor that there was no pressure left at the taps.

Digging up a concrete floor through a finished house would have meant days of mess and making good, so I looked for a better route.

Repiping from the floor above

Instead of breaking out the concrete, I cut off and abandoned the buried downstairs pipework and ran new copper from the floor above, dropping feeds down to each room. Floors came up in sections along the landing and bedrooms so the new runs could be clipped, insulated and crossed between joists properly.

Working this way meant I could get the whole ground floor sorted without any plastering. We had thought a wall might need chasing out, but careful routing avoided it completely.

A secondary hot water circuit

A house this size has long pipe runs, so even with new pipework you would be waiting ages for hot water to reach the far taps. I put in a secondary hot water circuit, the same setup hotels use, which keeps hot water moving around the house.

The result is noticeably better pressure and instant hot water when you run a tap, whichever room you are in. All of the new valves are accessible and labelled so the system is easy to isolate in future.

Landing floor lifted in sections to run new copper hot water pipework through the house in Guidepost
During
New copper hot water run clipped through the floor joists above the concrete ground floor
During
Copper hot water pipes crossing between joists under the bedroom floor
During
Copper feed bent down through a floor hatch to supply the downstairs taps
During
Finished copper manifold with blue handled isolation valves for the new hot water circuit
After